Home›Guides›HVAC & Heat Pump Factory Audit: 14-Point Checklist
HVAC & Heat Pump Factory Audit: 14-Point Checklist
The on-site audit list for Chinese HVAC factories: AHRI claim checks, brazing and leak-test discipline, refrigerant rules, capacity truth, spare-parts mapping.
Last reviewed: 2026-11-28 · Estimates from public sources — not customs or legal advice.
HVAC is unforgiving: a refrigerant circuit fails in the field, not in the showroom. This is the 14-point checklist our auditors run on Foshan-cluster factories — grouped so you can run a structured version yourself.
A · Certificates & performance claims (desktop, before the visit)
- AHRI directory cross-check — model numbers claimed in the quote must exist in the AHRI listing database; near-miss model numbers are a classic swap trick.
- Original DOE/lab test reports — request the lab’s own PDFs (with lab letterhead), not brochure scans; call the lab if in doubt.
- CE/ErP documentation — Ecodesign declarations matching the exact model family you’re buying.
- Refrigerant compliance routing — R32/R290 handling per destination: US EPA SNAP rules vs EU F-gas quota chain documentation.
B · Production discipline (on the line)
- Brazing station practice — operator method, brazing alloy control, and visual QC at each joint; sloppy brazing is the #1 warranty cause.
- Leak-test protocol — 100% helium or nitrogen leak test on heat exchangers (sampling here is disqualifying), plus rig calibration records.
- Coil/fin press condition — fin deformation and oil management on the fin press show up as capacity and noise complaints later.
- Control-board versioning — firmware and board-revision control documented; “it depends which batch” is not an answer your service team can use.
- Run-test station — every unit run-tested before packing, with data (temps, pressures) logged, not just “tested”.
C · Capacity truth (the sales brochure lies)
- Line count vs claimed output — count assembly lines, time the takt, and reconcile with monthly output claims.
- Seasonal surge behavior — ask what subcontracts to whom in peak season; your order quietly moving to a worse factory is the classic hidden risk.
- Component sourcing depth — compressor brand/origin (GMCC, Highly, etc.), in-house coils vs purchased — affects both cost stability and QC reach.
D · After-sales infrastructure (where most buyers get burned)
- Spare-parts mapping — documented OEM cross-references for boards, remotes, sensors, compressors; without it, your service channel dies with batch one.
- Warranty economics — their defect-allowance policy in writing (typically 0.5–1.5% in this vertical), and who pays freight on warranty parts.
Run A on desktop before you fly; run B–D on-site in one structured day. That is exactly our factory audit scope — scored report with photo evidence, from $449. Combine with supplier verification ($249) before you commit tooling.
FAQ
What is the most important check in an HVAC factory audit?
Leak-test discipline. A coil that passes functional test but leaks 18 months later generates warranty claims for years. Confirm 100% (not sample) helium or nitrogen leak testing on heat exchangers, with calibration records for the test rigs.
How do I verify AHRI/DOE performance claims?
Cross-check the model number against the AHRI directory and ask for the original lab test reports — not a brochure scan. Claims that can't be traced to a lab are marketing fiction; our verification flow does this before you list a product.
Why is spare-parts mapping an audit item?
Your service channel dies with the first batch unless control boards, remotes and parts have documented OEM cross-references and firmware archives. Factories rarely offer this unless the buyer demands it — so demand it.