Home›Guides›Verify a Chinese Supplier: 12-Point Pre-Payment Checklist
Verify a Chinese Supplier: 12-Point Pre-Payment Checklist
The 12 checks before any deposit: registry & scope, ISO/CE certificate authenticity, factory-vs-trader detection, bank-account matching, commitment ladder.
Last reviewed: 2026-11-28 · Estimates from public sources — not customs or legal advice.
Every sourcing disaster we investigate fails at least three of the twelve checks below — usually before any money moved. Run all twelve, in order, before your first deposit.
Identity layer (who are they, legally)
- Registry check. Business licence via official channels (Samr registries, GSX/天眼查 equivalents): registration date, registered capital (paid-in, not subscribed), legal representative, and — critically — the business scope vs what they claim to manufacture.
- Licence scope vs product. A licence reading “wholesale: electronic products” that claims to manufacture precision medical parts is a trader or worse. Manufacturing scope language exists for a reason.
- Litigation & penalties. Court records and administrative-penalty lookups: quality-dispute judgments, customs penalties, labour disputes at scale. A factory with 30 labour lawsuits in two years is a capacity problem in disguise.
Capability layer (can they actually make it)
- Factory-vs-trader determination. Ask for the machine list with models/years, then verify a sample on video call with the camera moving through the shop (fixed “factory tour” videos are recycled). On-site audit settles it — see our audit scope.
- Certificate authenticity. ISO 9001/13485: contact the issuing certification body and verify certificate number, validity and scope. CE: locate the Notified Body number and check it against the NB database; the CE logo alone proves nothing.
- FDA reality check. For US-bound regulated goods: establishment registration ≠ 510(k) clearance ≠ your product is legal to market. Check which of the three the supplier actually has.
- Price sanity. Compare quoted price against market bands for the material/process. A quote 30% under band is not a bargain — it is a process substitution (thinner walls, recycled resin, unqualified alloy) or bait.
Transaction-safety layer (protect the money)
- Bank account = company name. Never wire to a personal account or a company whose name differs from the contract party. The mismatch excuse (“our boss’s account is faster”) is the classic near-end-stage fraud signal.
- Trade references. Two or three reference buyers contacted independently (not the supplier’s pick, if avoidable): did promised specs hold at delivery? How were quality disputes handled?
- Commitment ladder. Cap exposure per stage: sample fee (small) → paid trial order (≤$5k typical) → first production run (30/70 or 50/50 payment split against inspection results). Never let tooling payment and production deposit land on the same invoice.
- Golden sample discipline. Sign off a sealed golden sample before production; reference it in the PO (“per golden sample #A-2026-01, held at…”). This one line prevents the most common post-payment dispute.
- Inspection gate before balance payment. Balance payment releases only after a pre-shipment inspection passes AQL — buyer-side, with photos.
How this maps to our $249 verification
Layers 1–3 and 5–7 are exactly what our supplier verification package runs — registry + scope, certificate authenticity with issuing bodies, price sanity, trade references — delivered as a pass / pass-with-conditions / fail report with evidence. Layers 8–12 are process disciplines we enforce on every order we manage.
The math is simple: verification costs $249. A mis-specified factory costs a mould, a production run, and a season. Run all twelve; skip none.
FAQ
What is the single most common supplier fraud pattern?
The trading company posing as a factory — sometimes acceptable, but fatal when your spec needs in-house process control. The second most common: certificates (ISO/CE/FDA) that are borrowed, expired, or scope-mismatched. Both are caught by the checklist below.
Can I rely on Alibaba's Verified Supplier badge?
No. The badge verifies legal existence and basic on-site presence at a point in time. It does not validate certificate authenticity, capability for your spec, or financial health — it is a floor, not a ceiling.
How much should I commit before verification?
Sample fees and small tooling deposits only — and never to a personal bank account. The checklist's 'commitment ladder' section caps exposure at each stage: sample → trial order → first production run.