Home›Services›Factory Audit
Factory audit — see the production line before it sees your deposit.
A desktop check can be faked with borrowed photos. An audit can't. But most audits fail buyers in a quieter way: they run a generic checklist that proves nothing for your product. Ours is product-mapped — the auditor walks the line with your spec sheet in hand.
Audit timing is a decision, not a formality.
Before tooling
The only moment with full negotiating leverage. An audit before tooling money moves is cheap insurance; an audit after is an investigation.
Before first production PO
Confirms the factory that aced the sample still owns the process at volume — subcontracting usually appears here.
Annually / on change
Ownership changes, moved premises, new product lines — every one resets the clock. Annual re-audits are standard for repeat programs.
Five scored sections — mapped to your product.
| Section | What gets checked | Red flags that fail it |
|---|---|---|
| 1 · Quality system (ISO 9001-mapped) | IQC/IPQC/FQC station reality, calibration records, golden-sample management, non-conformance handling, cert scope vs processes | QMS exists on paper only; no calibration trail; cert scope ≠ actual process |
| 2 · Equipment & process | Machine park vs claim (models/ages), CMM capability, brazing/leak-test stations for HVAC, cleanroom class for medical, finishing lines | Outsourced core processes undisclosed; test rigs without calibration |
| 3 · Capacity & staffing | Line count vs claimed output, takt timing, shift structure, subcontracting patterns | Capacity claims need "seasonal partners" — your order quietly moves to a worse factory |
| 4 · Compliance & trade | Social-compliance basics (hours, dorm, safety), export documentation history, FDA establishment registration where applicable | Serious safety violations; export history that doesn't match claims |
| 5 · After-sales readiness | Spare-parts mapping, firmware/board versioning, warranty economics, defect-allowance policy | No parts mapping = your service channel dies with batch one |
The scored report
- Five section scores (0–5) with weighted product-specific weighting
- Photo evidence per finding — what we saw, not what we were shown
- Corrective-action recommendations ranked by risk
- Verdict: pass / pass-with-conditions / fail — with the conditions written as enforceable PO clauses
Fee, timing, bundling.
| Item | Detail |
|---|---|
| Fee | from $449 (1-day standard; travel added outside Jiangsu/Zhejiang/Guangdong/Foshan clusters) |
| Report turnaround | 5–7 working days including travel scheduling; same-week slots in main clusters |
| Bundle | Audit + verification bundle saves $99 — see pricing |
| Follow-through | Failed audits get a corrective-action plan; re-audit at 50% fee after remediation |
FAQ
When should I audit — before or after the first order?
Before tooling and before the first production deposit, always. Auditing after money has moved converts an audit into an investigation. For repeat programs: re-audit annually or after any ownership/capacity change.
What does a 'scored' audit report actually contain?
Five sections (quality system, equipment & process, capacity, compliance, after-sales readiness), each scored 0–5 with photo evidence per item, plus corrective-action recommendations and a pass/conditions/fail verdict against your product's specific requirements — not a generic checklist.
Can the factory see the audit report beforehand?
No. The report belongs to you. Factories receive the findings through corrective actions you choose to share — that separation is what keeps the audit honest.
What if the factory refuses an audit?
Refusal is data. A factory with the capability it claims has nothing to lose from a walk-through. We treat refusal as a fail on the engagement and tell you why.
Do you audit against a specific standard?
Our audits are product-mapped rather than certificate-mapped: ISO 9001 structure for the QMS section, IATF-16949-style process thinking for automotive-adjacent parts, ISO 14644 cleanroom checks for medical-adjacent, plus social-compliance basics. The scored report references the framework each item maps to.
One day enough?
For a single-line factory producing your product family: yes, one structured day. For multi-building sites or high-risk categories (medical, pressure-containing), 2 days. We tell you which before you pay.