Home›Services›Quality Inspection

Quality inspection — AQL 2.5, evidence included.

Quality problems start after the order is placed — exactly when most agents stop watching. Our inspectors are buyer-side, photo-document everything, and classify defects against the AQL standard you choose. The report doesn't just say “pass”: it shows you the sampling math, the defects found, and what the factory must fix.

Inspection types

Three checkpoints, each with a different job.

First-article / pilot check

Confirms the golden sample survived setup: dimensions, materials, function on the first 20–50 units. For CNC batches this rides on FAI with CMM reports (see the CNC practice).

During-production (inline)

At 20–50% completion: catches process drift while correction is cheap — tolerance drift, material substitution, assembly-sequence errors. The highest-leverage inspection of the three.

Pre-shipment (final)

At ≥80% packed: AQL sampling on function, finish, dimensions; packaging, carton drop-readiness, label/FBA-prep accuracy. The last gate before your goods ship.

How the sampling math works (no hand-waving)

Order sizeSample size (Level II, normal)Ac/Re at AQL 2.5 (major)Meaning
91–150 units32Ac 2 / Re 33+ major defects in sample = batch rejected
281–500 units50Ac 3 / Re 44th major defect fails the lot
501–1,200 units80Ac 5 / Re 66th major defect fails the lot
3,201–10,000 units200Ac 10 / Re 1111th major defect fails the lot

Critical defects (safety/regulatory): zero acceptance — one critical defect fails the batch regardless of count. We set criticality definitions with you before the first inspection, based on your product's real risks.

Deliverable

The report — evidence, not adjectives.

What you receive

  • Pass/fail verdict against the agreed AQL, with the sampling table shown
  • Defect classification (critical/major/minor) with photos per defect type
  • Dimensional & functional test results against your spec
  • Packaging, carton, label & (if FBA) prep-accuracy verification
  • Corrective-action section — factory response required before re-shipment
Placeholder Pre-shipment inspection in progress Replace with real photo: inspector AQL-sampling cartons, defect photos annotated on tablet.
ItemDetail
Feefrom $299 per man-day inspection, all-inclusive report
StandardAQL 2.5 / 4.0 default (ISO 2859-1 / ANSI/ASQ Z1.4) — adjustable per contract
CoverageInspectors within 48h in Jiangsu/Zhejiang/Guangdong/Foshan clusters; report 1–2 working days after visit
Honest limits: AQL sampling is statistical — it reduces, not eliminates, defect risk, and cannot catch batch substitution between inspection points. Critical specs get a golden sample locked at our office plus inline checks. Inspection is risk management, not a guarantee — anyone promising zero defects is selling you something.

Add QC to your next order

FAQ

What does 'AQL 2.5' actually mean?

AQL (Acceptable Quality Limit) under ISO 2859-1 / ANSI/ASQ Z1.4 defines the worst defect rate still acceptable. At AQL 2.5 major defects, a 500-unit order samples 80 units: pass if ≤5 major defects found, fail at 6+. It's statistical — it protects you against systematic problems, not against every single defect.

Why inspect during production at all — isn't final inspection enough?

Final inspection catches finished defects; inline inspection catches process drift while it's still cheap to fix. A tolerance drifting out at 30% completion means the whole batch is wrong — found at final inspection, it's a full rework; found inline, it's a machine adjustment.

What's in the report beyond pass/fail?

Defect classification (critical/major/minor) with photos per defect type, sampled-and-rejected counts against AQL tables, dimensional/functional test results, packaging and label verification, and a corrective-action section the factory must respond to before re-shipment.

Who is the inspector loyal to?

You. Inspections are buyer-side and paid by you — the same independence rule as our verification and audits. Factory-hired 'QC' reports the factory's truth; ours reports yours.

What can inspection NOT catch?

Latent field failures (a leak that appears in month six), design-level defects, and batch substitution between inspection points. That's why critical specs pair inspections with golden-sample custody and process-parameter checks.

Container already at the port — too late?

Not necessarily. We can run a port-side check on packed cartons (sampling, carton integrity, label verification), but this is weaker than a proper pre-shipment inspection at the factory. Book inspections for when goods are ≥80% packed — not after loading.